Transitional Bracing MethodsNumber One: Cut Out 1. You need 3 identical templates. Using a 2-by-4 as a model, trace cut marks holding it flush with curve's edge. 2. Distribute brace/cut marks as evenly as possible. 3. With a jigsaw, cut out all marked spaces just outside of lines. 4. Nail in some bracing 2-by-4s to hold up structure. 5. Cut 2-by-4s to width of ramp. 6. Slide 2-by-4s into cut slats (they should fit snugly). 7. Connect platforms, top platforms, additional bracing or coping. 8. Apply to sheet(s) (see string and compass)--use nail punch to drive nails flush.
Number Two: Side Nail
This method is quicker to build and much less work. 1. After cutting the templates, simply nail in 2-by-4s through the sides at the same angle as the first method, using 3"-4" Flathead nails per side per stud (this woks much better if you have help to hold the 2-by-4s in place). 2. Follow steps 7 and 8 of method one.
|